Gongzui Hydropower Station Scenic Area
The Gongzui Hydropower Station is situated on the Dadu River, a tributary of the Minjiang River in Sichuan Province, 90 kilometers downstream from Leshan City. It is mainly used for power generation. The project was built in two phases according to a "high dam design, low dam construction" plan. Phase one has an installed capacity of 700 MW, including two powerhouses — one behind the dam and one underground on the left bank. The powerhouse behind the dam has an installed capacity of 400 MW. The underground powerhouse has an installed capacity of 300 MW. The total firm output of the plant is 179 MW, with an average annual power generation of 3.418 billion KW·h over many years. Electricity is transmitted to the Sichuan power grid via four 220KV transmission lines, making it one of the main peak-shaving hydropower stations in the system. The main dam is a concrete gravity dam with a crest elevation of 530.5 meters and a maximum height of 85.5 meters. Phase one commenced in March 1966, with the first unit generating power in February 1972, and the entire phase completed in 1978. The specific plan for phase two is yet to be determined.
Hydrological and Reservoir Characteristics:
The drainage area above the dam site is 76,130 square kilometers. The multi-year average annual runoff is 47.25 billion cubic meters, with a multi-year average flow rate of 1,500 cubic meters per second and a multi-year average annual sediment discharge of 29.9 million tons. For phase one, the normal reservoir water level is 528 meters, the dead water level is 518 meters, and the total storage capacity is 339 million cubic meters, classifying it as a daily regulation reservoir. The dam is designed for a flood with a 1-in-1,000-year return period, with a peak flow of 13,700 cubic meters per second and a water level of 528.8 meters; it is verified for a 1-in-10,000-year flood with a peak flow of 15,800 cubic meters per second and a water level of 530.6 meters. The designed head of the power station is 48 meters, the maximum head is 53.08 meters, and the minimum head is 34.7 meters.
Layout of the Project:
The river valley at the dam site is U-shaped, with a relatively narrow water surface. The riverbed has a deep cover layer of 10–30 meters, and the dam foundation consists of pre-Sinian granite, which is hard in texture. The main dam is a concrete gravity dam, 370 meters long at the crest. The left section of the riverbed is the spillway section, equipped with four surface spillway bays — one on the left and three on the right — with a 9-meter-wide, 330-meter-long log sluice between them. An adjustable flume is installed at the inlet of the log sluice to accommodate changes in the reservoir water level.
The right section of the riverbed is the powerhouse dam section. The dam powerhouse houses four vertical-axis Francis turbine-generator units, each with a capacity of 100 MW, a rated speed of 88.2 r/min, a turbine runner diameter of 5.5 meters, and an umbrella-type air-cooled generator with a rated voltage of 15.75 KV and a stator core inner diameter of 12.8 meters. The auxiliary powerhouse is located upstream of the main powerhouse.
The underground powerhouse is situated on the left bank and contains three vertical-axis Francis turbine-generator units, which are identical in type, structure, and capacity to those in the dam powerhouse. The control room and auxiliary facilities are located on the downstream left bank. To reduce turbine wear caused by sediment, bottom outlets for flood discharge and sediment flushing are installed on both sides of the spillway and next to the installation bay of the dam powerhouse. A sediment barrier is also set up at the inlet of the left-bank underground powerhouse.
Flood Discharge Facilities:
On the left side of the spillway section, there is one spillway bay with a crest elevation of 506 meters, a width of 12 meters, and a height of 22 meters, with a maximum discharge capacity of 3,000 cubic meters per second. On the right side, there are three spillway bays with the same crest elevation and opening dimensions, having a maximum discharge capacity of 9,000 cubic meters per second. Bottom outlets for flood discharge and sediment flushing: two on the left bank, each 5 meters wide and 8 meters high, with a sill elevation of 472 meters; one on the right bank, 5 meters wide and 6 meters high, with a sill elevation of 471 meters. The total inflow for the seven generating units is 1,862 cubic meters per second.