Maoming Open-pit Mine Ecological Park
The Maoming Open-pit Mine Ecological Park was originally a mining site for the Maoming open-pit mine. It is located at the northwest corner of downtown Maoming, about 800 meters in a straight line from Hongqi North Road in the city center, with a planned area of approximately 10.07 square kilometers. The Beipai Forest Park has a planned area of about 6.93 square kilometers. The sites are respectively situated on the abandoned open-pit mine and the Beipai spoil bank of the Maoming Petrochemical Company, with a total investment of about 1.152 billion yuan. Its construction will benefit the restoration and optimization of the ecological environment in the former open-pit mining area and further highlight the history and cultural significance of Maoming’s petroleum industry.
The Maoming open-pit mine pit is a product of historical legacy. In August 1958, China’s largest open-pit mine in the south broke ground in Maoming. The extraction of Maoming’s oil shale was akin to performing a "cesarean section" on the earth: cutting along the richest parts of the mineral veins, stripping away the surface soil to expose the raw ore, and directly extracting the ore from the veins. Tens of thousands of oil technicians, skilled workers, and laborers gathered in the Maoming oil shale-rich region, using hoes, baskets, and shoulder poles to perform a modern version of "Yu Gong Moving Mountains." They built a small experimental furnace on Leidalin Mountain in the Maoming open-pit mine to test the extraction of crude oil from oil shale, then constructed large-scale retorts and oil refineries to produce barrels of oil.
From the large-scale production of the mine and shale retorting facilities in 1961 until their shutdown at the end of 1992, the cumulative mining volume reached nearly 200 million tons, with over 100 million tons of oil shale extracted and 2.92 million tons of shale oil produced, making a special contribution to alleviating the nation’s oil shortage.
In 2011, the Maoming Municipal Party Committee and Municipal Government resolutely gave up the substantial mining profits from developing kaolin, coal, and other resources in the area, and decided to shut down the open-pit mine.
In February 2012, the Maoming High-Tech Zone initiated the planning and construction of the Open-pit Mine Ecological Park. Following the principle of combining restoration with optimization, and adapting to local conditions, making the best use of what was available, and drawing on local resources, the project focused on building four major initiatives: “diverting water, constructing roads, planting trees, and building museums.” Existing terrain and the original mine environment and facilities were used as much as possible. Specific projects included diverting water from the Jianjiang River to construct a large artificial lake with nearly 100 million cubic meters in capacity, renovating roads around the lake totaling about 23 kilometers, planting trees on approximately 6,300 acres year by year, constructing a large petroleum culture museum, and attracting an investment of about 1 billion yuan to build a 100-megawatt solar power generation project.
Through a series of attractions such as flower viewing, sightseeing, water activities, and exhibitions, a large-scale open ecological park integrating industrial characteristics, landscape gardens, mines, and leisure was created. It provides citizens with a versatile destination for daily leisure activities that combines culture, tourism, relaxation, and vacation.
On December 31, 2013, the Maoming Petrochemical Company handed over a total area of 20.31 square kilometers, including the southern and northern spoil banks and the mine pit, to the Maoming Municipal Government.
In 2014, the construction of the Open-pit Mine Ecological Park was fully launched. Building the ecological park is a people-benefiting initiative by the Maoming Municipal Party Committee and Municipal Government to vigorously implement the five development concepts of “innovation, coordination, green development, openness, and sharing.”
Lake Creation
The pit left by the discontinued mining operations gradually formed a large lake. The Maoming Municipal Party Committee and Municipal Government made full use of the natural environment and adapted to local conditions. By implementing a water diversion project to improve the water quality of the lake, they created a multifunctional reservoir that integrates ecology, irrigation, and landscape.
The water diversion project began in October 2014 and includes the expansion of an 800-meter public canal branch, the construction of a new 950-meter water diversion channel, a new 1,130-meter flood discharge channel, the building of a 920-meter dam, and the creation of a 40,000-square-meter artificial sandy beach swimming area. With the continuous inflow of fresh water and neutralization treatment, some indicators have approached Class II water quality standards. Fish now swim in groups in the mine pit lake, and birds also inhabit and forage there.
The lake is about 1 kilometer wide, 6.8 kilometers long, and approximately 90 meters deep at its deepest point. The water diversion project became operational on March 31, 2016. The mine pit lake is now connected to the Gaozhou Reservoir, the Jianjiang River, and the Xiaodong River system via the water diversion channel. Diverting water into the lake has completely transformed the water quality of the pit, playing a positive role in irrigating approximately 8,800 acres of surrounding farmland and effectively improving the ecological environment of the Xiaodong River basin. It will also add a reservoir with a storage capacity of 160 million cubic meters to Maoming.
The water in the Maoming open-pit mine pit lake is acidic and not suitable for drinking or irrigation. Improving the water quality of the waste mine pit through water diversion is a prerequisite for the “revival” of the open-pit mine.
Characteristic German-style log cabins have been built by the open-pit mine lake on a circular hillside, incorporating original German eco-friendly architectural elements. The structures are entirely wooden, covering a total area of more than 600 square meters.
In August 2017, the mine pit lake was named “Haixin Lake” in commemoration of Xian Furen, known as “China’s foremost heroine,” whose spirit of “using only a good heart” has been elevated to a city spirit. “Good-hearted Maoming” has gained widespread recognition.
On August 13, 2018, Haixin Lake of the Open-pit Mine was selected as one of the “Top Ten Cultural Icons of Maoming” in the relevant evaluation activity.
The Maoming Open-pit Mine carries a long history of mining culture and preserves profound historical memories in the development of mining in Maoming, Guangdong, and even the whole country. The Maoming Municipal Party Committee and Municipal Government have vigorously promoted the construction of the Open-pit Mine Museum, striving to create a richly meaningful museum — the first mining heritage museum in Guangdong.
The Open-pit Mine Museum covers a total construction area of more than 9,000 square meters. The project began construction in December 2015, and after the main structure was completed, it was handed over to the Municipal Bureau of Culture, Radio, Television, and Tourism for exhibition arrangement. Once completed, the museum will become a comprehensive facility integrating functions such as exhibitions, science education, and collection, dedicated to inheriting Maoming’s mining culture and the spirit of the Oil City. It is the first mining heritage museum in Guangdong.
In addition to exhibitions, the museum also offers functions such as sightseeing and leisure. According to the functional zoning, it includes historical and cultural exhibitions, displays of industrial artifacts, science education on the petrochemical industry, and screening rooms. Through the display of industrial relics and participatory experiences, it comprehensively showcases the development process, historical significance, and cultural heritage of the open-pit mine from 1958 to 2019.
On March 26, 2019, after years of construction and intensive preparation, the Open-pit Mine Museum was finally opened to the public.
The museum has three floors: the first floor houses the Urban Memory Exhibition Halls 1 and 2; the second floor contains the Petrochemical Science Exhibition Halls 1 and 2; the third floor features the 60th Anniversary Achievement Exhibition of Maoming City. The Open-pit Mine Museum is free to the public.
Opening hours: 09:00–12:00 AM, 14:30–17:30 PM; closed every Monday.