Home › Tourist Attractions › Gehaiyan Dam

Gehaiyan Dam

Category: Tourist Attractions 👁 100 views
The Gehaiyan Hydropower Station is located on the main course of the Qingjiang River, a tributary of the Yangtze River in Changyang County. It lies 62 km downstream from the Qingjiang River estuary and 9 km from downtown Changyang. The structure is a concrete gravity arch dam with a maximum height of 151 m. The reservoir has a total storage capacity of 3.4 billion cubic meters. The hydropower station has an installed capacity of 1.2 million kW and a guaranteed output of 187,000 kW. The annual power generation…

Gehaiyan Dam

The Gehaiyan Hydropower Station is situated on the main course of the Qingjiang River, a tributary of the Yangtze River in Changyang County. It lies 62 km downstream from the Qingjiang River estuary and 9 km from downtown Changyang. The structure is a concrete gravity arch dam with a maximum height of 151 m. The reservoir has a total storage capacity of 3.4 billion cubic meters. The hydropower station has an installed capacity of 1.2 million kW and a guaranteed output of 187,000 kW. The annual power generation is 3.04 billion kW·h. The project is primarily for power generation, but also provides benefits such as flood control and navigation. The reservoir retains 500 million cubic meters of flood control capacity, which can not only reduce flood peaks downstream of the Qingjiang River but also stagger the timing of flood peaks with those of the Yangtze River, thereby reducing the need to use the Jingjiang Flood Diversion Project and delaying the timing of any diversion. Construction began in January 1987, the first generating unit was commissioned in June 1993, and the project was completed in 1995.

Upstream Power Station Intake — At the dam site of the Gehaiyan Hydropower Station, the mountain peaks on both banks are around 500 m above sea level. During the dry season, the river is 110–120 m wide, with steep slopes of 50–60 m in the lower part of the valley. The upper part of the valley is steeper on the right bank and gentler on the left, forming an asymmetrical canyon. The dam foundation consists of Cambrian Shilongdong limestone, with the rock strata running almost perpendicular to the river, dipping upstream at an angle of 25°–30°. The total thickness of the rock layers is 142–175 m. The upper parts of the dam abutments on both banks consist of interbedded limestone and shale of the Pingshanba Formation. The basic seismic intensity is 6 degrees, and the design intensity is 7 degrees.

The drainage area above the dam site is 14,430 square kilometers, with an average annual flow of 403 cubic meters per second and an average annual runoff of 12.7 billion cubic meters. The measured maximum flood peak flow is 18,900 cubic meters per second, and the minimum flow is 29 cubic meters per second. The average annual sediment concentration is 0.744 kg per cubic meter, with an annual sediment transport volume of 10.2 million tons. The project is designed for a flood with a one-in-a-thousand-year return period of 22,800 cubic meters per second, corresponding to a reservoir water level of 202.77 m. It is checked against a flood with a one-in-ten-thousand-year return period of 27,800 cubic meters per second, corresponding to a reservoir water level of 204.59 m and a reservoir capacity of 3.77 billion cubic meters. The normal storage level is 200 m, with a corresponding reservoir capacity of 3.4 billion cubic meters. The dead water level is 160 m, and the active storage capacity is 2.2 billion cubic meters. The project flooded 1,138 hectares of farmland and relocated 26,086 people.

The Qingjiang River is the first major tributary that the Yangtze River receives after exiting the Three Gorges. It is 423 km long, with a drainage area of 17,000 square kilometers, mostly mountainous. The region enjoys a mild climate and abundant rainfall, with an average annual precipitation of about 1,400 mm and an average flow of 440 cubic meters per second. Developing the Qingjiang River can provide abundant electricity, reduce the flood control burden on the Yangtze River, improve waterway transportation in the mountainous areas of southwestern Hubei, and is of great significance to the development of Hubei Province and the ethnic minority regions of southwestern Hubei.

Source: Changyang Government Website