Yiling Yangtze River Bridge
Adjacent to Maji Mountain and spanning the Yangtze River is the Yiling Yangtze River Bridge, which had a total investment of 610 million yuan and commenced construction on November 28, 1998. With a total length of 3,246 meters, a main bridge length of 936 meters, and a deck width of 23 meters, it is the only three-tower, inverted Y-shaped, single-plane cable-stayed bridge with a concrete stiffening girder on the Yangtze River, and its span is the longest of its kind in the world. The bridge employed 20 new technologies, materials, and techniques during its construction. It was completed and opened to traffic at the end of 2001. Since then, Yichang City has had four Yangtze River bridges: the Zhijiang Railway Bridge, Yichang Yangtze River Highway Bridge, Yiling Yangtze River Bridge, and Xiling Yangtze River Bridge, all serving as vital links for the city’s economic takeoff.
Project Overview
The Yiling Yangtze River Bridge is located in Yichang City, Hubei Province, serving as an urban bridge connecting the northern and southern banks of Yichang across the Yangtze River. The bridge site is approximately 7.6 km downstream from the Gezhouba Dam, with the river width at the site being about 800 meters and the maximum water depth around 23 meters. In consideration of the specific navigational conditions at the bridge site, the design boldly innovated by proposing, for the first time, a single-plane three-tower cable-stayed bridge scheme. Its main span of 2x348 meters is the longest in China and also ranks first in the world among similar bridges. The project actively adopted “new technologies, new materials, new techniques, and new equipment” during design and construction, achieving numerous breakthroughs in bridge-building technology.
The total length of the bridge project is 3.246 km, with a designed load capacity of vehicles up to super Class 20. The main bridge is the first single-plane prestressed concrete three-tower cable-stayed bridge in China. The span arrangement (in meters) is 38+38.5+43.5+2x348+43.5+38.5+38 over eight continuous spans, with a main bridge length of 936 meters and a total investment of 613.6 million yuan. The main bridge deck is 23.0 meters wide, featuring four motor vehicle lanes, with 2.0-meter-wide sidewalks on each side of the lanes, and a 3.5-meter-wide central cable zone.
The foundation of the middle tower uses 16 bored piles, each with a diameter of 2 meters and a length of 42.0 meters. The pile cap measures 16m x 16m. The side towers use 11 bored piles, each with a diameter of 2.0 meters, with the north side tower piles being 44.0 meters long and the south side tower piles 34.0 meters long. The pile cap dimensions are 14m x 16m. All three concrete main towers share the same structure, with only minor dimensional differences. The upper section of the towers features an inverted Y-shape. The side towers are of equal height, with the side and middle towers having longitudinal dimensions of 5.5 meters and 7 meters, respectively.
The stay cables are positioned in the center of the bridge deck. Each numbered stay cable in cross-section consists of two cables, spaced 1.2 meters apart. The spacing between cables on the beam is 8 meters for the main span and 5.5 meters for the side span, while the spacing on the towers is about 1.6 meters. Each side tower has 18 pairs of stay cables, and the middle tower has 32 pairs, totaling 236 stay cables for the entire bridge. The stay cables use a parallel steel strand system with a fully enclosed new structure and unbonded anchors. Each steel strand has a diameter of 15.24 mm, with galvanized strands encased in a PE outer layer and filled with oily wax. The steel strand strength is 1770 MPa, with an allowable stress [σ] of 0.45. The total weight of the stay cables is 1,225 tons.
The main girder uses a single-box, three-cell cross-section, a three-directional prestressed concrete structure, with a girder height of 3.0 meters, a top slab width of 23.0 meters, and a bottom slab width of 5.0 meters. The cantilever slabs on both sides extend 3.5 meters. The side span and the 0th block at the side tower of the main girder together measure 131 meters and were constructed using full scaffolding and cast-in-place methods. The 0th block at the middle tower is 22 meters long and cast in place. The main girders of the two main spans were constructed using precast segmental cantilever assembly, with wet joints approximately every 40 meters—each 0.5 meters wide—while the rest are dry joints. Excluding the closure segment, there are seven wide wet joints in the main span. The standard length of the girder prefabricated blocks is 4.0 meters, with each standard segment weighing 160 tons.
The main bridge used approximately 5,673 tons of steel, 1,225 tons of stay cable steel strands, and about 43,898 cubic meters of concrete.
Application of New Technologies and Scientific Innovation
1. The three-tower, single-plane cable-stayed bridge scheme was proposed at the right time. Covering the entire navigation area with two large spans, this scheme offers favorable navigational conditions. The construction and installation cost was 165 million yuan, yielding significant economic benefits.
2. The side spans use a multi-span continuous structure to enhance the stiffness of the three-tower cable-stayed system. This approach reduces the technical difficulty of achieving stiffness compared to a two-tower system, resulting in a rational structural system that is feasible and economical.
3. Diamond-shaped bridge towers. These towers distribute forces efficiently, have strong impact resistance, and are simple to construct. Their novel design achieves a harmonious balance of structural performance, aesthetics, and economy.
4. The cantilever assembly of the main girder utilized a complete set of mature calculation programs and monitoring techniques, enabling the successful high-precision closure of both main spans simultaneously without any forced measures.
5. The closure cables of the cable-stayed bridge use both internal and external tendons. After detailed study of the behavior of the external tendons, a segmented anchoring design concept and a full set of anchoring detail designs were proposed, pioneering new ideas in bridge design.
6. Established a world record for the longest segmental prefabricated assembly of prestressed concrete box girders. The main girder was constructed using the segmental prefabricated assembly method, achieving results such as guaranteed quality, fast construction speed, short duration, and cost savings. Its 348-meter assembly span is the longest in the world, and the maximum double-cantilever full bridge length of 383 meters is also unprecedented.
7. Employed a new fully enclosed copper strand cable-stayed system with multiple technical advantages. This system offers high precision in cable force establishment, easy construction, no need for large lifting equipment, superior corrosion resistance, and ease of replacement.
8. Developed an advanced lightweight, multifunctional walking hydraulic-controlled cantilever launching gantry crane. Weighing 34 tons, it moves smoothly through the cable zone, features stepless speed variation, produces minimal lifting impact, and allows the lifted girder block to move 50 cm forward and backward, facilitating alignment adjustments in six degrees of freedom.
9. Created a set of specialized tools to perfect a new process for threading bundled long steel strands inside the main girder.