No. 5 Vertical Shaft of the Shuikoushan Lead-Zinc Mine
Constructed in 1957, it features a double-deck, double-cage system, consisting of a main cage and an auxiliary cage. The main cage is used for production, while the auxiliary cage is for transporting personnel. The shaft mouth elevation is 86.29 meters, and the shaft bottom elevation is -302.28 meters. It was the first lead-mining vertical shaft developed after the founding of the People’s Republic of China. On March 5, 2013, it was announced by the State Council as a National Key Cultural Relics Protection Unit.
Protected Area: Starting from the outer edge of the ground headframe, extending 15 meters in all four directions.
Construction Control Zone: Extending 60 meters beyond the protected area in all four directions.
This page is published by HowToTrip. Sharing and reposting are welcome — please credit the source.
Page URL: https://www.howtotrip.net/artgk54564