Aswan High Dam
Introduction The Aswan High Dam was first built between 1898 and 1902 to provide irrigation and generate electricity. By the 1960s, the dam could no longer meet the needs of land irrigation and power supply, so the Egyptian government began constructing the current dam 6 kilometers upstream from the old one, completing it in 1971. Today, the dam generates enough electricity to meet most of the country’s power demands. The dam stands 111 meters high, 3,830 meters long, and 40 meters wide, cutting across the Nile River and causing the water to back up 500 kilometers, forming the artificial Lake Nasser with a storage capacity of 164 billion cubic meters. It helps control flooding and stores surplus water sufficient for several years. During the severe drought in the Nile Basin in the 1980s, when famine struck Sudan and Ethiopia, Egypt was spared thanks to this dam. Ticket / Opening Hours Visiting hours: 7:00 AM to 5:00 PM
Aswan, Egypt
This article is published by HowToTrip. Sharing and reposting are welcome — please credit the source.
Article URL: https://www.howtotrip.net/travel-11598