Home › Tourist Attractions › Erlangshan Tunnel

Erlangshan Tunnel

Category: Tourist Attractions 👁 100 views
The Erlangshan Tunnel on the Sichuan-Tibet Highway, constructed by China Railway 16th Bureau Group Fifth Engineering Co., Ltd., is located along National Highway 318. Its axis lies at a mountain divide elevation of 2,948 m, with the tunnel site at an altitude of 2,200 m and a maximum burial depth of 748 m. Construction began in July 1996 and was completed in December 2001. The main tunnel...

Erlangshan Tunnel

The Erlangshan Tunnel on the Sichuan-Tibet Highway, built by China Railway 16th Bureau Group Fifth Engineering Co., Ltd., is situated along National Highway 318. Its axis lies at a mountain divide elevation of 2,948 m, with the tunnel site at an altitude of 2,200 m and a maximum burial depth of 748 m. The tunnel broke ground in July 1996 and was completed in December 2001. The main tunnel is 4,176 m long. At the time of construction, it was the longest, deepest-buried, highest-altitude, and highest geostress highway tunnel in China, characterized by extremely complex geological conditions. It is a straight tunnel with one-way traffic in both directions, featuring a grade change point in the middle. The tunnel adopts a single-center circular profile, with an inner contour radius of 4.83 m, a clear width of 9.0 m, and a clear height of 6.85 m. The road surface has a bidirectional herringbone cross slope of 1.5%; it has two lanes, with a pavement width of 7.50 m. The parallel adit is 4,155 m long, primarily serving ventilation and emergency access purposes. It connects to the main tunnel via 14 cross passages spaced 42.5 m apart; the parallel adit has a clear width of 4.5 m, a clear height of 4.5 m, is a single lane, and has a pavement width of 4.0 m. The project’s preliminary design estimate was 489 million yuan, and the final settlement was 439 million yuan, resulting in savings of 50 million yuan.

The Erlangshan Tunnel was constructed using the New Austrian Tunneling Method (NATM) with composite lining. As a high geostress, extra-long tunnel, it was designed to withstand a maximum horizontal stress of 50 MPa, with the actual measured maximum being 32.7 MPa. Rockburst and large deformation zones account for 60% of the total tunnel length. The western portal section crosses 79 m of shallow-buried, bias-pressure colluvial deposits and karst sections with underground rivers. The completion and opening of the tunnel not only shortened the route by 25 km but, more importantly, avoided the previously unavoidable rainy, foggy, icy, snowy, frozen, landslide, collapse, and debris flow-prone mountain-pass sections. It ended decades of one-way traffic control and ensured all-weather passage.

The Erlangshan Tunnel is 4,176 m long. When construction began, it was the longest, deepest-buried, highest-altitude, and highest geostress highway tunnel in China, with extremely complex geological conditions. It led the nation in high geostress testing and engineering optimization, as well as high-altitude operational ventilation, with some research projects reaching international advanced levels.