The Gudong Seawall of the Shengli Oilfield
The Gudong Seawall of the Shengli Oilfield is a land reclamation project constructed to enable offshore oil extraction on land. It was built in April 1985 and completed in July 1988. The seawall stretches over 80 kilometers from the mouth of the Yellow River in the south to the Bohai Sea northwest of the piles in the north, with a base width of 38 meters, a top width of 10 meters, and a height of 5 meters, protected by bluestone or precast concrete slopes, and the top of the wall is an asphalt road. The project reclaimed a total of 500 square kilometers of land, leading to the establishment of oilfields such as Gudong and Zhuangxi. From atop the seawall, one can gaze upon this massive structure snaking along the coast like a dragon; inside the embankment, the newly formed land is filled with densely packed derricks, and oil pumps (commonly called “nodding donkeys”) rise and fall in unison; outside, the boundless blue waters are dotted with fishing sails, and drilling platforms rise imposingly.
This page is published by HowToTrip. Sharing and reposting are welcome — please credit the source.
Page URL: https://www.howtotrip.net/artgk41446