Jinping Reservoir is located on the Niu Valley River, an upstream tributary of the Sandu River, which is itself a branch of the Wei River, in Tongwei County. The dam site is situated at 105°05′30″ east longitude and 35°14′44″ north latitude, 16 kilometers from the county town. Upstream of the Heiyao Gorge dam site, the controlled catchment area is 191 square kilometers. The vegetation in the drainage basin is relatively sparse, covered predominantly by loess…

Jinping Reservoir

Jinping Reservoir is located on the Niu Valley River, an upstream tributary of the Sandu River, which is itself a branch of the Wei River, in Tongwei County. The dam site is situated at 105°05′30″ east longitude and 35°14′44″ north latitude, 16 kilometers from the county town. Upstream of the Heiyao Gorge dam site, the controlled catchment area is 191 square kilometers. The vegetation in the drainage basin is relatively sparse, covered predominantly by loess, with a designed annual erosion modulus of 9,600 tons per square kilometer (approximately 70% of the total annual sediment inflow occurs during July and August; runoff is mainly supplied by storm rainfall, with a designed annual runoff volume of 6.2 million cubic meters). The long-term average runoff depth is 32.5 mm, the long-term average sediment concentration is 295 kg/cubic meter, the annual suspended load sediment transport is 1.31 million cubic meters, and the annual bedload sediment transport is 65,000 cubic meters. The reservoir basin has a continental climate characterized by aridity and low precipitation. The upper reaches around Huajialing, at an elevation above 2,300 meters, are a semi-humid area with a long-term average annual precipitation of 500 mm. The downstream county town of Tongwei sits at an elevation of 1,770 meters, with a long-term average annual precipitation of 439.5 mm and an annual evaporation rate of 1,396 mm. The evaporation rate is 3.2 times that of the precipitation, and the distribution of rainfall within the year is also uneven. The crop-growing period from April to June accounts for only 36% of the annual rainfall. Drought is the most significant natural disaster in the region.

Jinping Reservoir is a medium-sized reservoir with a total capacity of 12 million cubic meters. The constructed reservoir complex consists of three parts: the dam, the water discharge and flood diversion tunnel, and an emergency spillway. The dam is 38 meters high with an additional 1.2-meter-high wave wall, 6 meters wide at the crest, and 110 meters long. The water discharge and flood diversion tunnel is a circular shaft with a diameter of 5 meters and a total length of 276 meters. The inlet adopts a bank tower intake structure with three flat steel gates installed at the entrance. There is one emergency spillway, 279.05 meters in total length. The reservoir primarily serves three functions: flood control and disaster mitigation, agricultural irrigation, and urban water supply. It provides an effective irrigated area of 20,000 mu, a guaranteed irrigated area of 14,000 mu, and supplies 1.1 million cubic meters of water annually to the urban area. It supports the sustainable economic and social development of Tongwei County and is closely linked to the lives of residents in both the irrigation area and the county town. Its role becomes increasingly vital as the local economy develops and the region works toward building a moderately prosperous society in this arid and rain-scarce area.

In the western part of Tongwei, known for its frequent droughts and often dried-up rivers, lies a shimmering man-made lake—Jinping Reservoir. From afar, the dam stands majestically, holding back a vast expanse of blue water. The reservoir's waters wind around the mountains, enhancing their beauty, while the mountains frame the water, adding to the scenery. The blue sky and white clouds are mirrored in the water, and green trees and grass sway along the shores, presenting a delightful sight of a tranquil lake in a high valley. Especially after summer and autumn storms, countless ravines churn down from the mountains with earth-shaking force, but upon reaching the reservoir, they obediently calm down and merge into the still waters.

Jinping Reservoir is the most invested-in, largest-capacity, and most socio-economically beneficial water conservancy project in Tongwei. It is also the only medium-sized reservoir in Dingxi Prefecture that combines water storage, flood and irrigation control, and urban water supply functions. Over the 30 years since its completion and operation, it has continuously supplied water for agricultural production and the daily lives of urban and rural residents in Tongwei. It could be described as gathering the forces of nature over a hundred miles into one reservoir and collecting the rains from countless streams to nourish thousands of households.

Jinping Reservoir is located on the Niu Valley River, about 16 kilometers northwest of Tongwei County Town. The dam site is situated at Heiyao Gorge within Jinping Township, with the Huashuang Highway passing along its eastern side. The construction began in 1972, and by the end of 1975, the main structures were largely completed, with water storage commencing in September of the same year. The controlled catchment area upstream is 191 square kilometers. The reservoir complex consists of the dam and the water discharge and flood diversion tunnel. The dam features a core wall filled with red clay and earth, standing 37 meters high, with a crest length of 105 meters and a width of 6 meters. The water discharge and flood diversion tunnel is located on the right bank, 276.4 meters in total length, with a diameter of 5 meters, entirely lined with reinforced concrete. Its maximum discharge capacity is 270 cubic meters per second. The gate operation equipment is a 60-ton hoist.

In 1979, Jinping Reservoir completed the lining of the 164-meter-long water discharge and flood diversion tunnel and installed replacement hoisting equipment. It then began trials such as “clear water storage and flood discharge,” earning research achievements recognized as “advanced within the province” and “comparatively advanced nationally.” On June 26, 1980, due to the failure of the reservoir’s flood discharge gate, the reservoir was drained, causing the water level to drop sharply and resulting in a serious landslide on the upstream dam slope. In response, the state invested a total of 1.37 million yuan to reinforce and repair the dam. The water discharge and flood diversion tunnel was fully lined with reinforced concrete, and consolidation grouting was applied to the surrounding rock mass. The gates were inspected and modified, extending the reservoir’s lifespan from the originally designed 15 years to 125 years. In October 1982, Jinping Reservoir was commended by the Provincial Water Resources Department for “providing an example for reservoirs nationwide.”

As the original construction took place during the Cultural Revolution, the flood control standards were low, and numerous hidden dangers existed, leading to operational difficulties and the inability to fully realize the reservoir’s benefits. In May 1994, the Provincial Water Resources Department approved a reinforcement project for Jinping Reservoir. Construction began in September 1996 and was fully completed by October 2003, with a total investment of 11.4767 million yuan. The project improved the reservoir’s flood control standards, raising the design flood check level from a 500-year to a 1,000-year event. A 279-meter-long emergency spillway was added, increasing the reservoir’s flood discharge capacity to 710 cubic meters per second on top of the original capacity. Additionally, an automated monitoring and dispatch system was established, enabling automated surveillance of the reservoir and achieving automated management for safety forecasting and optimal operation scheduling. Through a series of renovations and upgrades, Jinping Reservoir now has a total capacity of 12 million cubic meters, controls an effective irrigated area of 20,000 mu, and guarantees irrigation for 13,000 mu. In October 2000, after four years of construction, the Jinping Reservoir water supply project was completed and put into operation. This project included the laying of 15 kilometers of pressurized pipelines and the construction of a water treatment plant with a daily capacity of 1,600 tons, providing clean and sweet tap water to residents in the urban area and nearby communities, resolving long-standing water supply issues. Looking back at the construction history of Jinping Reservoir, it can be divided into three major phases. The first phase was the preparatory and initial construction stage. In January 1958, the Tongwei County Committee and the Dingxi Regional Agricultural Construction Bureau conducted the first survey and planning of the Niu Valley River basin, and in May, they submitted the “Report on the Planning and Design of the Niu Valley River Basin.” In October 1959, the reservoir construction headquarters was established, and construction began in December. However, due to famine and other reasons, 120 workers died, and the project was halted in May 1960 after six months. The second phase involved the main and auxiliary construction. In 1972, under the national strategy promoted by Chairman Mao—“dig deep tunnels, store ample grain, avoid hegemony, and prepare for war and famine for the people”—the Gansu Provincial Revolutionary Committee Production Command approved the “Design Task Document for Jinping Reservoir in Tongwei County.” In October, the reservoir construction resumed for the second time, and the reservoir construction command was established. The Gansu Provincial Water Conservancy and Electric Power Exploration and Design First Brigade was responsible for the expanded preliminary design. Thousands of builders gathered at Heiyao Gorge from various agencies and units across the county. Under slogans like “battle against heaven and earth” and “man can conquer nature,” a concerted effort to develop water resources commenced. After three years of hard work, the reservoir was completed in September 1975, and the gates were closed for water storage. The third phase focused on reservoir maintenance, reinforcement, and renovation. Over the more than 20 years starting in June 1980, several large-scale reinforcement projects and technical upgrades were carried out, significantly improving the reservoir’s flood control standards and effectiveness. Especially with the completion of the urban water supply project, the reservoir’s service functions were expanded, achieving diversified utilization of water resources and completely changing its previous single agricultural focus. This transformation marked a shift from traditional to modern water conservancy practices.

The construction of Jinping Reservoir benefits the present and future generations. With the passage of time and ongoing development, it will continue to bring greater advantages to the people of Tongwei and play an even more significant role in advancing the region’s industrial and agricultural development and improving the living standards of its people.