On September 14, 1991, construction of the Ertan project officially commenced. Due to the massive scale and technical complexity of the project, international competitive bidding was adopted for the main civil engineering works. More than ten engineering contractors won bids for the dam and underground powerhouse projects. Several major international consortiums set up operations at Ertan, marking the first instance of international joint development in the history of China's water conservancy...

Ertan Hydropower Station

On September 14, 1991, construction of the Ertan project officially commenced. Due to the massive scale and technical complexity of the project, international competitive bidding was adopted for the main civil engineering works. More than ten engineering contractors won bids for the dam and underground powerhouse projects. Several major international consortiums set up operations at Ertan, marking the first instance of international joint development in the history of China's water conservancy development.

Resettlement: The areas submerged by the Ertan reservoir were mainly located in Miyi and Yanbian counties under Panzhihua City, with a small portion in Yan Yuan, Dechang, and Xichang in Liangshan Prefecture. A total of 24,841 mu of arable land were submerged. By 1995, 29,372 people had been relocated, 960,000 square meters of housing demolished, and the entire county seat of Yanbian County was moved.

Preliminary Works: A total of 46 items, including 3 bridges, 9 roads, 7 construction power supply projects such as the Santan 110KV substation, 4 living quarters areas, 13 excavation projects for the left and right diversion tunnels and access tunnels (including both tunneling and open-cut), as well as individual projects such as communication and seismic monitoring. Construction began in September 1987.

At 10:00 AM on May 1, 1998, the temporary bottom outlet of the Ertan Hydropower Station’s arch dam was closed, marking the first time the Yalong River stopped flowing. The Ertan Reservoir began to store water. On August 18 and November 16, two 550,000-kilowatt generating units were officially put into operation. After flowing silently for millennia, the Yalong River finally delivered its hidden light and roar to the people.

From July to September, the Yalong River experienced an unusually high number of consecutive heavy rainstorms, leading to frequent flooding. Five successive flood peaks all had river flows exceeding

8,000 cubic meters per second, with the largest peak occurring on August 10 during the third flood of the Yajiang section, where the inflow reached 10,200 cubic meters per second — the second highest recorded flood peak in history. The Ertan Reservoir, for the first time holding water, played a significant flood control role even before the dam and spillway structures were fully completed, reducing the flood peak by an average of 34% (with the largest reduction reaching 57%). The five flood events collectively intercepted 3.424 billion cubic meters of floodwater, making a major contribution to alleviating flood pressure downstream along the Yangtze River. In December, Ertan Hydropower Development Co., Ltd. was awarded the title of “1998 National Advanced Collective in Flood Control” by the National Flood Control Headquarters, the Ministry of Personnel, and the General Political Department of the People’s Liberation Army.

Address: Ertan Hydropower Station, Yanbian County, Panzhihua

Share

This page is published by HowToTrip. Sharing and reposting are welcome — please credit the source.
Page URL: https://www.howtotrip.net/artgk67220

↑