Hydroelectric Power Station Scenery
Introduction: The Kulbin Hydropower Station is located more than 160 kilometers from Xunke, built on the upper reaches of the Kulbin River, with a reservoir capacity of 420 million cubic meters. The Baishi Hydropower Station is situated on the middle reaches of the Kulbin River. The surrounding mountains of the reservoir are covered with lush green trees, and the water in the reservoir is exceptionally clear. Along the road from the Baishi Hydropower Station to the Wusonggang Hydropower Station, there is a stretch of natural birch forest. The forest is very clean and refreshing, with fresh air, making it a perfect place to enjoy a forest bath.
Heihe City, Heilongjiang Province
This page is published by HowToTrip. Sharing and reposting are welcome — please credit the source.
Page URL: https://www.howtotrip.net/artgk13614